ABOUT CVL > STRATEGIC ALLIANCES
 
     
 
Technical Collaboration Agreement with M/s.Riley Power Inc.
 
 
 
 
Cethar Vessels Ltd has signed a Technical Collaboration Agreement with M/s.Riley Power Inc. subsidiary of M/s.Babcock Power Inc. Worcester, USA to design, manufacture and supply Pulverized coal fired boilers for power plants upto 600 MW operating at sub-critical pressures.
 
 
   
  About RILEY Power...    
       
 
Products
   
 
     
Natural circulation Boilers for utility application  
Steam generation capacity ranging from 45 T/Hr to 1800 T/Hr  
Boilers for waste to energy applications  
Replacement pressure parts  
Low NOx burners – Coal, Oil & Gas  
Pulverizers / Mills – Atrita, MPS, Ball tube  
Replacement parts for burners  
Replacement parts for mills  
FGD and SCR for emission control  
   
       
  Services    
 
     
Boiler condition assessment & evaluation  
Unit performance evaluations  
Commissioning & start up  
Fuel conversions  
Training  
In-house metallurgical laboratory  
   
       
  Salient Features    
 
     
Riley Power Inc. is a subsidiary of Babcock Power Inc. (BPI), USA
 
 
 
An Original Equipment manufacturer (OEM) for over 90 years for supplying steam generating and fuel burning equipment
 
 
 
For all types of fossil and waste fuel fired Boilers
 
 
 
A leading worldwide supplier of technology, equipment & services to the Power generation industry
 
 
 
Leading technology supplier for SCRs
 
 
 
Unparalleled expertise with FGD technology
 
     
   
  Cethar Vessels in Alliance with Harbin Turbine Ltd    
       
 
Harbin Turbine Company Ltd.(HTC) is one of the largest backbone enterprises in China built in 1956, with 5500 staffs including more than 1200 technicians and engineers, from which there are about 400 persons with senior title . HTC possesses the first class R&D capacity in the steam turbine manufacturing industry in China. Annual Capacity: 30’000MW.
   
       
  Harbin Electrical Machinery Co. Ltd Established in 1951    
       
 
3600 sets of facilities  
   
Chinese largest manufacturer in  
 
     
Turbo-generator (up to 700 MW)  
Hydro-turbine (up to 700 MW)  
Hydro-generator (up to 700 MW)  
A.C (up to 42MW) & D.C (up to 5.5MW) motor  
Auxiliary & control equipment  
 
     
Employee: Approx.7000  
     
 
Technician:1800 (more than 500 senior engineers, 800 engineers and 2000 technical workers)
 
 
     
   
  CETHAR VESSELS in Alliance with Worley Parsons    
       
 
Leading professional services provider to the Energy, Resource, and Complex Process Industries. Organised into four Customer Sector Groups:
Hydrocarbons | Power | Minerals & Metals | Infrastructure
   
       
 
Power  
   
 
     
  Coal-Fired Plants
  Combustion Turbine/Combined Cycle
  Nuclear
  Transmission Distribution/Substations
  Air Quality Control
  Gasification
  Operations and Maintenance
  Owner’s Engineer
   
       
 
CVL has signed a technical collaboration agreement with M/s. KRAFTANLAGEN MUENCHEN
   
       
 
CVL has signed a technical collaboration agreement with M/s. KRAFTANLAGEN MUENCHEN, Germany (KAM) for Engineering, Manufacturing, Supply & Erection of Power Plant Piping for units above 200 MW for both sub-critical & super-critical applications.
   
 
     
Technology transfer for welding & heat treatment processes for advanced materials like P23, P92, etc.
 
Training of CVL personnel at KAM works  
Supervision by KAM personnel at CVL works & training  
   
       
  About KAM    
       
 
One of the leading European companies with more than 50 years of experience, qualified for piping systems and Plant construction with more than 50 years of experience.
   
 
     
Core Strengths  
     
Technical Expertise  
Reliable Project Handling
 
Offers services from a single source, from the initial
study, to the approval procedure & through to the
turn- key hand over
 
After sales services  
The net sales revenue in 2007 was 303 Million Euro
(Approx.)
 
   
       
  Experience of KAM    
 
     
Kam is well - versed with the usage of advanced materials like X10, X20, P23, P92 and high alloy materials like P22 & P91for high pressure and temperature application.
 
     
Typical steam parameters for super-critics units coming up in India (Mundra - 5X800MW)
 
       
 
Main Steam Pressure & Temperature: 273.2 Kg/Cm2 (a) & 573.5 oC
 
 
Hot reheat steam pressue & Temperature: 66.9 Kg/Cm2 (a) 601.1 oC
 
     
KAM is currently executing many power plants of capacity up to 800 MW with steam parameters of
 
       
 
Main Steam Pressure & Temperature: 320 Kg/Cm2 (a) & 610 oC
 
 
Hot reheat steam pressure & Temperature: 80.6 Kg/Cm2 (a) & 625 oC